Report – Pouring a logistics platform – H-UKR

Find out in video the pouring of a logistics dock done last week.

Thanks to our very low carbon H-UKR technology, we realized a savings of 140 tons of CO2 on this structure versus the traditional use of Portland cement.

That’s the equivalent of 140 Paris-New York round trips by plane !

In addition, we have developed our solutions so that our customers can integrate them directly into their work process, without having to change their machine park or work methodology.

Efficiency and performance.

More than ever, the best Co2 is the one that does not emit.